Projects out to Bid
Estimated Construction Budget: $700,000-$725,000
1. The general scope of the project includes the milling, paving and repair of Hollister Drive and parking lots, Cradit Farm Drive, and Forest Home Drive; repair and replacement of curbs and sidewalks; drainage structure alternations and modifications; associated utility work;...
Estimated Construction Budget: $3,300,000 - $3,400,000
Construct a complete, modern sprinkler and fire protection system for the Geneva Barton Lab, which includes exterior work to connect to both the Cornell main and the City of Geneva main. Work will also include the replacement of an existing generator and installing a new fire pump.
Estimated Construction Budget: $7.0M-$7.2M
Reconfigure and repurpose the floors of King-Shaw Hall from a Conference Center and events space to a vibrant hub for ILR (Industrial Labor & Relations) student services on the second level, and a new administrative space for students and visitors to the Brooks School. The new...